Project Description
Project Name
Neyshabur-Shariati Power Plant Storage Tanks
Type Of Work
Engineering, Procurement, Construction
Year
2011 up to now
Client
Shariati Power Plant Co. & Khayam Power Plant Co.
Location
Neishabour, Mashhad-Iran
Status
Finished
More Information
Construction of 3 sets 20,000 & 15,000 m3 Gasoil Storage Tanks & their Facilities Including Civil, Piping, Firefighting, Electrical & Instrument, MCC Room, Substation, etc.
This project has been implemented in order to increase the storage capacity of the above mentioned plants alongside the systems. The project’s description includes the construction of three units of atmospheric reservoirs with capacities of 15,000 and 20,000 m3, respectively, in two units at Shariati power plant in Mashhad and one in Khayyam power plant in Neyshabur.
Fuel transmission lines, suction flotting systems, firefighting systems, fuel tank control systems, boilers and fuel heating lines, PLC S7-400 control and monitoring systems, and medium voltage power panels have been the systems for the above-mentioned reservoirs
Engineering, procurement, construction of these reservoirs and systems has been the responsibility of the Rahbordsazeh Company.
The main equipment of the project includes:
Equipments | Numbers |
---|---|
Atmospheric reservoirs a fixed range with a capacity of 15,000 m3 | 2devices |
Atmospheric tank a fixed range with a capacity of 20,000 m3 per device | 1device |
Firefighting pumps with a capacity of 350 m3 / hr | 2devices |
Firefighting pumps (joke) with capacity of 30 m3 / hr | 2devices |
Steam boiler with a capacity of 4 tons per hour | 1device |
Heating fuel coils | 2devices |