Project Description
Project Name
Mahshahr Power Plant/Gas pressure Reducing Station
Type Of Work
Engineering, Procurement, Construction
Year
2017
Client
TPPH
Location
Mahshahr-Iran
Status
Finished
More Information
In this project, natural gas with a pressure of between 400-1300 Psi and a maximum capacity of 200,000 m3 enters into the gas pressure reduction station of the Mahshahr Power Plant and after the filtration and heating with pressure between 300-400 Psi exit the station.
The gas pressure reduction station of the Mahshahr Combined Cycle Power Plant with a capacity of 200,000 m3 per hour was designed and implemented to reduce the inlet gas pressure from 400-1300 Psi and bring it to the 300-400 Psi
The station has three lines each with a capacity of 100,000 m3 that one line acts as a reservation
Engineering, procurement, construction as well as commissioning for one and a half years was also the responsibility of Rahbordsazeh Company.
The main equipment of this station includes:
Equipments | Numbers |
---|---|
Heaters 50,000 m3 | 3 |
Slam -Shut off valves | 3 |
Scrubber of 100,000 m3 | 2 |
Regulators | 6 |
Separators Filter 50,000 m3 | 3 |
relief valve | 3 |
gas cylinders 50,000 m3 | 3 |
Plug & ball valves | Different Sizes |
Photometer | 1 |
Analayzer | 1 |