Project Description
Project Name
Iranshahr Steam Power Plant Gas Buring Project
Type Of Work
Engineering, Procurement, Construction
Year
2014-2017
Client
Zahedan Power Production Co.
Location
Iranshahr-Iran
Status
Current
More Information
Replacement of Iranshar steam power plant existing fuel burners to dual Fuel Including Fuel gas piping, New burners installation, Gas train valves, BCS & BPS Control Systems, Electrical & Instrument, etc.
This project has been implemented as the first of its kind in Iran to reduce the environmental pollution caused by the use of heavy fuel liquids in the boilers of this power plant
In this project four boiler units of 300 tons of steam were equipped with dual- burners and thus significantly reduced the volume of pollutants produced by the power plant
The quality of the exhaust smoke from the power plant was within the acceptable range of environmental standards
The project includes the construction of gas pipelines from the gas station to the power plants to the consumption areas along with steam boilers, Installation of new dual- burners, installation of control valves in the direction of transmission and entry of gas into burners, construction and installation of control panels and operation of new burners, The construction and installation of protection panel for the new burner system, the programming and commissioning of control and protection systems have been with the international standards of the power plant.
The main equipment of the project includes:
Equipments | Numbers |
---|---|
Dual burners with a capacity of 30 MW | 36 Units |
Gas transmission lines with a size of 12 inches | 2000 Meters |
Control valves 6 to 12 inches | 72 pcs |
Manual valve 2 to 12 inches | 88 pcs |
Flame detector systems | 36 pcs |
Gas analyzer systems for combustion | 4 pcs |
Protection of control systems panels | 24 Cells |
Operating control systems panels | 4 Cells |