Project Description
Project Name
Abadan Power Plant Storage Tanks Expansion
Type Of Work
Engineering, Procurement, Construction
Year
2011-2014
Client
Abadan Power Plants Co.
Location
Abadan-Iran
Status
Finished
More Information
Engineering, Procurement & Construction (EPC) of two sets 15,000 & 35,000 m3 gasoil storage tanks including: piping, firefighting, electrical, control & instrumentation.
This project has been implemented in order to increase the storage capacity of Abadan combined cycle power plant simultaneously with the construction of the combined cycle units of this power plant that increased fuel consumption. The project includes the construction of an atmospheric reservoir with a fixed range of 20,000 cubic meters, firefighting systems, fire alarm, PLC control systems S7-400, steam boilers and secondary systems, fuel heat exchangers, UPS systems and battery charging.
Engineering, procurement, construction of these reservoirs and systems has been the responsibility of the Rahbordsazeh Company.
The main equipment of this complex includes:
Equipments | Numbers |
---|---|
Atmospheric tank a fixed range with a capacity of 20,000 cubic meters | 1device |
Steam boiler with a capacity of 2000 tons | 1device |
– Heating fuel heat exchanger | 1device |
Firefighting pumps | 1device |